How High Does the Ball Hit the Cliff?

  • Thread starter Thread starter Bryon
  • Start date Start date
  • Tags Tags
    Ball
AI Thread Summary
A man throws a ball at a cliff 31 m away, aiming for a point 5 m high, with a speed of 38 m/s. The ball takes 0.82 seconds to reach the cliff, hitting at a height of 1.66 m and traveling at 37.3 m/s upon impact. A key point of confusion involves calculating the time to reach maximum height, which requires determining the initial vertical velocity. The correct approach involves using the angle derived from the distance and height to find the vertical components accurately. Miscalculations in time and angle have led to incorrect results, highlighting the importance of correctly applying physics formulas.
Bryon
Messages
98
Reaction score
0
A man standing 31 m from the base of a vertical cliff throws a ball with a speed of 38 m/s aimed directly at a point 5 m above the base of the cliff.

Question:

How long does it take the ball to reach the cliff? 0.82s

Neglecting air resistance and the height of the man, calculate the height above the base of the cliff at which the ball hits. 1.66m

How fast is the ball moving when it reaches the cliff? 37.3m/s

Here is where I am having trouble...

At what time does the ball reach its largest vertical height?

I am sure that I have to find the intitial vertial velocity:

31 = 38cos(x)(0.82) where x is the angle x = 5.8 degrees


vy0 = 38sin(x) vy0 calculated to be 3.84

vf = v0 + at
0 = 3.84 + (-9.8)t = 0.39s

time to max height i figured to be 0.39s

This is the incorrect answer, what did I do wrong? Any suggestions?

Thanks!
 
Physics news on Phys.org
I don't know how you got your value for x but I found a different value by putting x=arctan(A/B) where A = distance between man and base of cliff, and B = height of the cliff at which man is aiming.
 
Hey I have a very similar problem. How did you get a time of 0.82s. My numbers were 28m, 7m, and V=33 m/s. I tried using inverse tan 7/28 to get theta, and then used that theta in t = (33 cos theta)/28. but that's wrong, can someone help?
 
r34racer01 said:
Hey I have a very similar problem. How did you get a time of 0.82s. My numbers were 28m, 7m, and V=33 m/s. I tried using inverse tan 7/28 to get theta, and then used that theta in t = (33 cos theta)/28. but that's wrong, can someone help?

v = \frac{d}{t}
therefore
t = \frac{d}{v}

Instead, you wrote t=v/d. You multiplied cos(theta) by 33 and divided by 28, but 28 is distance and 33 is velocity. Alternatively, you can get the result by finding the length of the line between the ball thrower and the point on the cliff he is aiming using Pythagorean theorem. (which is basically what you're finding when multiplying 28 by cos(theta))
 
Last edited:
I multiplied the values first without the error limit. Got 19.38. rounded it off to 2 significant figures since the given data has 2 significant figures. So = 19. For error I used the above formula. It comes out about 1.48. Now my question is. Should I write the answer as 19±1.5 (rounding 1.48 to 2 significant figures) OR should I write it as 19±1. So in short, should the error have same number of significant figures as the mean value or should it have the same number of decimal places as...
Thread 'A cylinder connected to a hanging mass'
Let's declare that for the cylinder, mass = M = 10 kg Radius = R = 4 m For the wall and the floor, Friction coeff = ##\mu## = 0.5 For the hanging mass, mass = m = 11 kg First, we divide the force according to their respective plane (x and y thing, correct me if I'm wrong) and according to which, cylinder or the hanging mass, they're working on. Force on the hanging mass $$mg - T = ma$$ Force(Cylinder) on y $$N_f + f_w - Mg = 0$$ Force(Cylinder) on x $$T + f_f - N_w = Ma$$ There's also...
Back
Top