What is the minimum number of units required to be connected to a BMS?

AI Thread Summary
The minimum number of units required to connect to a Building Management System (BMS) varies based on the desired level of control and monitoring. Key units typically include chillers, air handling units (AHUs), fan coil units (FCUs), fans, pressurizing fans, variable air volume (VAV) systems with and without reheat coils, and pumps in the secondary chilled water circuit. Equipment specifications and connection diagrams from manufacturers usually outline the required connections. Ultimately, the consensus is that more connections generally enhance system performance and management. The specific needs will depend on the individual building's requirements.
afa13
Messages
7
Reaction score
0
Hello,
does anyone know how much is the minimum required points that should be connected from the following units to the BMS:
1) chiller
2) AHU
3) FCU
4) Fan
5) Pressurizing fan
6) VAV with reheat coil
7) VAV without reheat
8) Pumps (secondary chilled water circuit)
 
Engineering news on Phys.org
Does the abbreviation "BMS" stand for "Building Management System"? If yes, then the required connections would normally be listed in the equipment specification and connection diagrams from the manufacturer.

If no, then please provide more detailed information without using abbreviations. Thank you.

Bobbywhy
 
Yes, it is Building Management System. And the answer depends on the level of control and monitoring desired. IMO, the more the better! There is no one-size-fits-all answer.
 
Last edited:
Hi all, I have a question. So from the derivation of the Isentropic process relationship PV^gamma = constant, there is a step dW = PdV, which can only be said for quasi-equilibrium (or reversible) processes. As such I believe PV^gamma = constant (and the family of equations) should not be applicable to just adiabatic processes? Ie, it should be applicable only for adiabatic + reversible = isentropic processes? However, I've seen couple of online notes/books, and...
I have an engine that uses a dry sump oiling system. The oil collection pan has three AN fittings to use for scavenging. Two of the fittings are approximately on the same level, the third is about 1/2 to 3/4 inch higher than the other two. The system ran for years with no problem using a three stage pump (one pressure and two scavenge stages). The two scavenge stages were connected at times to any two of the three AN fittings on the tank. Recently I tried an upgrade to a four stage pump...