tsutsuji
Gold Member
- 1,219
- 15
page 6/12
Implementation steps
【Step 1】 check of water quality using the existing 3 boreholes
【Step 2】 check of water quality in pumping wells (sequentially implemented)
【Step 3】 Lowering of groundwater level due to groundwater bypass (gradually implemented)
* As a result of operating gradually and of monitoring, implementation is done while checking water quality and groundwater level decline status etc.
* In accordance with the groundwater level decline, the lowering of the buildings' accumulated water levels is performed.
* As the lowering (recovery) of the water level surrounding buildings takes several months, water level management is carefully performed so that the buildings' accumulated water does not leak outside.
page 7/12
Abridged schedule
While checking water quality and groundwater level decline status, etc. , implementation is done gradually and carefully.
Implementation steps
【Step 1】 check of water quality using the existing 3 boreholes
【Step 2】 check of water quality in pumping wells (sequentially implemented)
【Step 3】 Lowering of groundwater level due to groundwater bypass (gradually implemented)
* As a result of operating gradually and of monitoring, implementation is done while checking water quality and groundwater level decline status etc.
* In accordance with the groundwater level decline, the lowering of the buildings' accumulated water levels is performed.
* As the lowering (recovery) of the water level surrounding buildings takes several months, water level management is carefully performed so that the buildings' accumulated water does not leak outside.
page 7/12
Abridged schedule
While checking water quality and groundwater level decline status, etc. , implementation is done gradually and carefully.
Attachments
Last edited: