Assemble shrink fit with a big shaft ∅203 mm?

  • Thread starter Thread starter cherish
  • Start date Start date
  • Tags Tags
    Fit Shaft
AI Thread Summary
The discussion centers on the challenges of assembling a large shaft (∅203 mm) using a shrink fit method involving liquid nitrogen and high-temperature heating of the hub. Initial attempts failed due to insufficient cooling of the shaft, leading to difficulties in assembly. After properly cooling the shaft and heating the hub, the assembly was successful, but a gap of 0.5 mm was discovered post-assembly, raising concerns about the effects of heating and the shaft's edge tolerances. The importance of thermal soaking, alignment during assembly, and the use of a hydraulic press for assistance were emphasized as critical factors for success. Future approaches may focus on solely cooling the shaft to achieve the desired fit without complications.
cherish
Messages
19
Reaction score
3
Assemble "shrink fit" with a big shaft ∅203 mm?

Dear all,

Just a short question that is it possible to contract the shaft in liquid nitrogen and heat up the hub around 300°C so that we can assemble them together quickly? We are delivering a prototype to our customer with a tight requirement on interference fit from drawing of them as in attachments.

At the first time we calculated the contraction of steel per degree of linear expansion/contraction and think that it's ok and we just freezed the shaft and then got stuck about 1/3 (100 mm fit), after trying to disassemble but couldn't then we cut out the hub to keep the shaft for reason of material in stock :(

Now is the last chance and we intend to freeze shaft and heat up hub as above but do we really need to freeze the shaft like this, or the contraction of steel will not work in this type of shaft because we did not have suitable tools for measuring accurately in a very quick time..

Thanks very much for any advices
 

Attachments

  • 12-8-2013 10-13-18 PM.jpg
    12-8-2013 10-13-18 PM.jpg
    43.3 KB · Views: 1,170
  • 12-8-2013 10-14-14 PM.jpg
    12-8-2013 10-14-14 PM.jpg
    15.3 KB · Views: 858
Engineering news on Phys.org
Once you know the crush required after thermal equilibration you can calculate the minimum temperature difference needed at the last moment of sliding assembly. The temperature difference at the start will need to be significantly greater.

If the components are not thermally soaked evenly they can take on distortions or extreme axial curvatures that will prevent assembly by gravity or by hand. This is especially true of long bores and shafts such as gun barrels.

You do not need to measure diameters when heated or cooled. It should be enough to know the temperature of the parts. That is what a non-contact IR thermometer is for.

Alignment during assembly is critical. There is no going back. It is good to have an assembly jig that aligns the components during assembly to avoid skew and so speed the assembly. It is also good to have a fast acting light press to bring them together once they are aligned in the jig.

I would make a dummy component with a minimum clearance to test the assembly jig prior to operation with production parts. That gives repeated room temperature practice at the assembly without risk of destroying components when it goes wrong.

Heating and cooling are both applicable to metals. You must however check the heat treatment profile that is acceptable for your particular materials. With some materials, cold can be as much of a liability as heat. How you achieve the differential temperature required is material dependent.
 
  • Like
Likes 1 person
This is an unusual design. I am curious why a keyway was not used.
 
The maximum (steel?) shaft diameter, 203.309 mm, should shrink to roughly 202.95 mm after coming to equilibrium with liquid nitrogen. It may have to soak for a while though because it's rather large. I suspect that was your initial problem.

Edit: When I've done these kinds of things in the past, I have the parts ready to be pressed together using a hydraulic press just in case it begins to hang up as it goes together. It could be the parts simply get cocked a bit or there's some ice or dirt on the surfaces that make assembly problematic even when you would think they should easily slide together. Having a hydraulic press ready to shove the parts together is good insurance.
 
Last edited:
I would be very concerned with runout tolerances over such a large fit surface. I didn't notice any in your diagram.
 
Hi everyone,

@Chronos: this is the free end of a winch drum then a keyway maybe not used, and the cylindricity as well as perpendicularity tolerances are 0.1 mm, both material grades are equivalent to EH36.

@Q_Goest: You're absolutely right, at the first time we did not carry out sufficient cooling down the whole shaft with nitrogen then this was the problem.

This time the shaft was fully boiled in liquid nitrogen nearly 1 hour and it gone through a gauge easily (we made an C-shaped from 5mm stainless steel) with upper limit tolerance 203.05 mm.
And simultaneously carried out resistance heating the hub approximately 450 degrees that allow the T-shaped gauge with lower limit tolerance 203.65 mm gone through smoothly.
Finally the shaft was assembled into the hub easily at the end of the day.
But, tomorrow morning we found a region with gap 0.5 mm as illustration in attached pictures (not whole the circle), we not sure that heating affected or radius edge 1.5 mm on shaft and chamfer edge 3x3 mm caused the problem. By the way, the inspector passed it already.

Next time maybe just cooling down the shaft is enough :)

Again, really thanks for all of your knowledgeable advices
 

Attachments

  • 12-14-2013 10-14-08 AM.jpg
    12-14-2013 10-14-08 AM.jpg
    18.8 KB · Views: 852
  • 12-14-2013 10-15-49 AM.jpg
    12-14-2013 10-15-49 AM.jpg
    30.2 KB · Views: 761
  • 12-14-2013 10-49-05 AM.jpg
    12-14-2013 10-49-05 AM.jpg
    51.7 KB · Views: 913
How did you find PF?: Via Google search Hi, I have a vessel I 3D printed to investigate single bubble rise. The vessel has a 4 mm gap separated by acrylic panels. This is essentially my viewing chamber where I can record the bubble motion. The vessel is open to atmosphere. The bubble generation mechanism is composed of a syringe pump and glass capillary tube (Internal Diameter of 0.45 mm). I connect a 1/4” air line hose from the syringe to the capillary The bubble is formed at the tip...
Thread 'Physics of Stretch: What pressure does a band apply on a cylinder?'
Scenario 1 (figure 1) A continuous loop of elastic material is stretched around two metal bars. The top bar is attached to a load cell that reads force. The lower bar can be moved downwards to stretch the elastic material. The lower bar is moved downwards until the two bars are 1190mm apart, stretching the elastic material. The bars are 5mm thick, so the total internal loop length is 1200mm (1190mm + 5mm + 5mm). At this level of stretch, the load cell reads 45N tensile force. Key numbers...
I'd like to create a thread with links to 3-D Printer resources, including printers and software package suggestions. My motivations are selfish, as I have a 3-D printed project that I'm working on, and I'd like to buy a simple printer and use low cost software to make the first prototype. There are some previous threads about 3-D printing like this: https://www.physicsforums.com/threads/are-3d-printers-easy-to-use-yet.917489/ but none that address the overall topic (unless I've missed...
Back
Top