Calculate TKPH Ratings for Mining Trucks Using VIMS Data: A Beginner's Guide

AI Thread Summary
The discussion focuses on calculating TKPH ratings for mining trucks using VIMS data, specifically addressing the mean tire load and weight distribution. The initial calculation of mean tire load was incorrect, as it did not account for the proper distribution of weight across the tires. Clarifications were requested on how to calculate load distribution for both empty and loaded conditions, emphasizing the need for accurate percentages for front and rear tires. The AWSS was correctly calculated, but the resulting TKPH values were deemed too high, indicating potential errors in the mean tire load calculations. Accurate weight distribution is crucial for reliable TKPH calculations in mining truck operations.
knightza
Messages
11
Reaction score
0
I've just started a research on the tyre of mining trucks and am a bit unsure on how to calculate the TKPH ratings.

Say for this set of data from VIMS,

GMW = 390 tons
Payload = 245.1 tons
Total cycle time = 15:29 minutes
Total cycle distance = 6.8 km

And that is one shift.

So, mean tyre load = 390 + 245.1/2 = 512.55 tons
AWSS = (6.8*1)/(15.5/60)

TKPH rating = mean tyre load * AWSS > 13000 ton-kilometer per hour which is REALLY big.

Can anyone see what I did wrong?
 
Engineering news on Phys.org
Mean Tire Load=(tire load empty+tire load loaded)/2
So GMW=390 that's vehicle loaded
Payload=245.1 that's the load, SO Empty vehicle=390-245=145
Then you have to obtain your vehicle information about weight disturibtion and number of wheels to get each tire load.
Like for example--2 front tires and 4 rear tires with distribution...
Empty Loaded
Front% 55% 35%
Rear% 45% 65%
front 39.87 53.63 ---mean tire load ...46.75
rear 16.31 63.37 ---mean tire load ...39.84


AWSS=6.8/(15.5/60)=26.3226
TKPH=MTL*AWSS
front =46.75*26.3226 = 1230
rear =39.84*26.3226 = 1048
THATS TOO some high as distance=6.8 km and low time 15.5 for the whole cycle,and sure big payload 245.
GOOD LUCK
 
Mean Tire Load=(tire load empty+tire load loaded)/2
So GMW=390 that's vehicle loaded

THE BELOW PASTED TREAD, NEED CLARFICATION.
ON LOADED CONDITION HOW IS THE LOAD DISCTRBUTION CALCULATED
EG ( 390*65%)/4= 63.37 BUT ON THE FRONT
(390*35%)/2=68.25,( IT HAS BEEN MENTIONED AS 53.63) HOW IT SI ARRIVED
PLEASE CLARFY AS I HAVE TO WORK ON CERTAIN TKPH CALUALTION.

CBC




Payload=245.1 that's the load, SO Empty vehicle=390-245=145
Then you have to obtain your vehicle information about weight disturibtion and number of wheels to get each tire load.
Like for example--2 front tires and 4 rear tires with distribution...
Empty Loaded
Front% 55% 35%
Rear% 45% 65%
front 39.87 53.63 ---mean tire load ...46.75
rear 16.31 63.37 ---mean tire load ...39.84


AWSS=6.8/(15.5/60)=26.3226
TKPH=MTL*AWSS
front =46.75*26.3226 = 1230
 
it is mistake, use the weight distribution% mentioned
 
Hi all, i have some questions about the tesla turbine: is a tesla turbine more efficient than a steam engine or a stirling engine ? about the discs of the tesla turbine warping because of the high speed rotations; does running the engine on a lower speed solve that or will the discs warp anyway after time ? what is the difference in efficiency between the tesla turbine running at high speed and running it at a lower speed ( as fast as possible but low enough to not warp de discs) and: i...
Thread 'Where is my curb stop?'
My water meter is submerged under water for about 95% of the year. Today I took a photograph of the inside of my water meter box because today is one of the rare days that my water meter is not submerged in water. Here is the photograph that I took of my water meter with the cover on: Here is a photograph I took of my water meter with the cover off: I edited the photograph to draw a red circle around a knob on my water meter. Is that knob that I drew a red circle around my meter...

Similar threads

Back
Top