How Can I Calculate Storm Water Management for a Site Plan Approval?

  • Thread starter Thread starter blimkie.k
  • Start date Start date
  • Tags Tags
    Storm Water
AI Thread Summary
Calculating storm water management for site plan approval requires demonstrating that post-development flows do not exceed pre-development flows for a 100-year event. The site includes a 50x60-foot building and a 500 square meter asphalt parking area, with 2% slopes planned for drainage. A civil engineer's quote of $3,000 for a site grading and storm water management plan has raised concerns about cost, especially since a previous topo plan cost the same amount. Effective storm water management may necessitate the inclusion of a pond or chamber with flow controls, and such plans typically need to be prepared by a licensed professional. Seeking guidance from qualified experts is recommended for compliance with agency requirements.
blimkie.k
Messages
130
Reaction score
0
I need some help dealing with storm water. I'm trying to get a site plan approved and the township engineer wants to see "calculations in the form of a storm water management brief to indicate how post development floes will be managed such that they do not exceed pre development flows for a 100 year event."

The building is 50x60 feet and the new aspalt parking area will be 500 sq metres. I have allready set slopes off the building to be 2% as well as 2% on the asphalt to the sides and ditch at the front of the lot.

A Civil Engineer wants 3,000 dollars to do a site grading and storm water managment plan. Thats too much the owner of the property is not happy because the same company allready charged him 3,000 for a topo plan.

Anyways just wondering if anyone could provide me with a link or point me in the right direction on how i could attempt these calcs.

Thanks.
 
Engineering news on Phys.org
I'm a Civil Enginer and have no idea what the previous responder was saying.

We would have charged you more than $3000 + $3000 to do a topo survey, produce a drawing, then a site grading plan, & stormwater calculations. To "manage" flows and not exceed pre-development, a pond or chamber along with flow controls would need to be included in the design as well. Agencies usually require these plans & calcs be performed under the direction of a qualified (licensed) individual. My advice, leave it to the professionals.
 
Hi all, I have a question. So from the derivation of the Isentropic process relationship PV^gamma = constant, there is a step dW = PdV, which can only be said for quasi-equilibrium (or reversible) processes. As such I believe PV^gamma = constant (and the family of equations) should not be applicable to just adiabatic processes? Ie, it should be applicable only for adiabatic + reversible = isentropic processes? However, I've seen couple of online notes/books, and...
I have an engine that uses a dry sump oiling system. The oil collection pan has three AN fittings to use for scavenging. Two of the fittings are approximately on the same level, the third is about 1/2 to 3/4 inch higher than the other two. The system ran for years with no problem using a three stage pump (one pressure and two scavenge stages). The two scavenge stages were connected at times to any two of the three AN fittings on the tank. Recently I tried an upgrade to a four stage pump...