How Do I Begin an Outline for a System Analysis Project?

AI Thread Summary
To begin an outline for a system analysis project focused on a customer relationship management system, start with a clear structure that includes key components such as a Risk Management Plan and a Recommendation section. The Risk Management Plan should encompass processes for risk identification, analysis, response planning, and monitoring. In the Recommendation section, detail the proposed solution, alternatives considered, and justification for the chosen approach, including cost estimates and project timelines. Utilizing mind mapping can be a helpful technique to visualize and organize these elements effectively. Establishing this framework will facilitate a comprehensive and coherent outline for the deliverable.
Susan Colins
Messages
1
Reaction score
0
Hi,

I need some help on my system analysis and design assignment. I need to put together part of an outline for a deliverable. Below is a little bit of background on the project.

This project will design and implement a customer relationship management system in order to provide superior customer service by rewarding our most loyal customers. Specifically, the system will track customer purchases, assign points for cumulative purchases, and allow points to be redeemed for "rewards" at local stores. This goal of this system is to provide an incentive to customers to choose Petrie Electronics as their first and only choice for making electronic purchases. The system will provide Petrie Management with improved information on the purchase behavior of our most loyal customers.

I need help starting my part of the outline for the deliverable

1. Risk Management Plan
a. Process
b. Risk Identification
c. Risk Analysis
d. Risk Response Planning
e. Risk monitoring, controlling, and reporting

2. Recommendation - detail narrative of your recommended solution. Be sure to discuss any alternatives investigated and why they were rejected in favor of your recommended solution. Include a discussion of the estimated cost to complete and the estimated schedule to complete with backup on how you arrived at these cost. The cost and schedule must be the same as in the Microsoft project deliverable below.

Just need some help understanding how to start this outline

Thanks,
Susan
 
Engineering news on Phys.org
Hi all, I have a question. So from the derivation of the Isentropic process relationship PV^gamma = constant, there is a step dW = PdV, which can only be said for quasi-equilibrium (or reversible) processes. As such I believe PV^gamma = constant (and the family of equations) should not be applicable to just adiabatic processes? Ie, it should be applicable only for adiabatic + reversible = isentropic processes? However, I've seen couple of online notes/books, and...
I have an engine that uses a dry sump oiling system. The oil collection pan has three AN fittings to use for scavenging. Two of the fittings are approximately on the same level, the third is about 1/2 to 3/4 inch higher than the other two. The system ran for years with no problem using a three stage pump (one pressure and two scavenge stages). The two scavenge stages were connected at times to any two of the three AN fittings on the tank. Recently I tried an upgrade to a four stage pump...
Back
Top