- #1
Michael Koch
- 7
- 8
I have a Leybold PGA 100 mass spectrometer, including the instruction manual. The instrument is paired with a gauge head. If either the instrument or the gauge head is exchanged, then an alignment is required. It's mentioned in the instruction manual there exists a supplement, which contains the alignment instructions. Does anybody have these alignment instructions? I'm ready to pay for a photocopy.
Thanks,
Michael
Thanks,
Michael