OnlyOneTruth
- 4
- 0
OnlyOneTruth said:http://www.tepco.co.jp/nu/f1-np/intro/outline/outline-j.html" from TEPCO after you pipe it through a translator.
Starting from the link to TEPCO's historical fukushima information I posted earlier, I've been digging through TEPCO's website and found some interesting bits I thought I should share:
- Construction of No4 started 9 months after construction of No5 (1972-9 vs. 1971-12)
- No4 is the only FukushimaDaichi reactor built by Hitachi, the other reactors were built by GE/Toshiba
CHronology at http://www.tepco.co.jp/nu/f1-np/intro/outline/outline-j.html has historical photograph of (No1?) construction:
[URL]http://www.tepco.co.jp/nu/f1-np/intro/outline/images/his_11.jpg[/URL]
Chronology also contains links to documentation of security audits, the second PDF on http://www.tepco.co.jp/nu/f1-np/press_f1/2008/htmldata/bi8a07-j.html is an appendix to a 2008 audit of No4 with loads of data and some visual documentation. I'll add two thumbs as a teaser:
I'm a quite tired and haven't checked everything, Not knowing Japanese, fiddling with Google translate, doesn't make things easier, so please be gentle if something I wrote is not accurate. I thought I'd share this before going to sleep. Cheers
Last edited by a moderator: