Control Chart Process: Detecting Shifts with 3 Sigma Limits and Mean Changes

  • Thread starter Thread starter axnman
  • Start date Start date
  • Tags Tags
    Control
AI Thread Summary
The discussion focuses on detecting shifts in a control chart using 3-sigma limits and the implications of a mean change from 200 to 209. A process is considered out of control if one point falls outside the 3-sigma limits or if two consecutive points are between the 2-sigma and 3-sigma limits on the same side. The main inquiry is about calculating the probability of detecting this shift on the first or second sample after the mean change occurs. The statistical parameters provided include a sample size of n=4 and a standard deviation of 10. Understanding these conditions is crucial for accurately assessing process control and shift detection probabilities.
axnman
Messages
14
Reaction score
0
Process is Out of control if 1 point plots outside 3-sigma limits or 2 consecutive points between 2-sigma & 3-sigma on same side...

if mean changes to mean1=mean0 + 9...what is probability to detect shift on 1st or 2nd sample following shift?

Point outside 3 sigma is ok but what @ the 2 consecutive points between...please help!
 
Physics news on Phys.org
This is absolutely opaque. I think you are dealing with a statistics situation but it's not clear from what you have said. Please try to clarify exactly what your problem says.
 
Ya statistics situation...sorry @ that,...

basically want to calculate the probability of detecting the shift on the first or the second sample when mean (say 200) shifts to a new value = mean + 9 (say 209)...(an out control situation is given as : if 1 point plots outside 3-sigma limits or 2 consecutive points between 2-sigma & 3-sigma on same side)
 
here is the actual question :

Samples of n=4 items are taken from a process at regular intervals. Suppose process mean is 200 and stnd. dev. =10

Assume the following rule is applied to control chart with 3-sigma limits:

The process is declared out of control when either a point plots outside of the 3-sigma limit OR 2 consecutive points plot between the 2-sigma & 3-sigma limits on the same side of the chart. If the process mean shifts to 209, what is the probability that the shift will be detected on the first or the second sample following the shift?
 
I picked up this problem from the Schaum's series book titled "College Mathematics" by Ayres/Schmidt. It is a solved problem in the book. But what surprised me was that the solution to this problem was given in one line without any explanation. I could, therefore, not understand how the given one-line solution was reached. The one-line solution in the book says: The equation is ##x \cos{\omega} +y \sin{\omega} - 5 = 0##, ##\omega## being the parameter. From my side, the only thing I could...