Japan Earthquake: Nuclear Plants at Fukushima Daiichi

Click For Summary
The Fukushima Daiichi nuclear plant is facing significant challenges following the earthquake, with reports indicating that reactor pressure has reached dangerous levels, potentially 2.1 times capacity. TEPCO has lost control of pressure at a second unit, raising concerns about safety and management accountability. The reactor is currently off but continues to produce decay heat, necessitating cooling to prevent a meltdown. There are conflicting reports about an explosion, with indications that it may have originated from a buildup of hydrogen around the containment vessel. The situation remains serious, and TEPCO plans to flood the containment vessel with seawater as a cooling measure.
  • #13,471
I don't think it would be possible for the water level inside the supression chamber to be below that in the torus room, as water is constantly being pumped inside the PCV and pumped out from the turbine buildings in order to keep the water level there about 1 meter below the ground water. I see no other mechanism than leaking to the torus room for the water in the PCV to get out, and this requires the water level in the PCV to be above that in the torus room.

EDIT: This was meant as a reply to a comment regarding the possibility of the water level in the PCV possibly being below that in the torus room. The comment was apparently removed while I was typing the reply, so this post is now quite irrelevant.
 
Last edited:
Engineering news on Phys.org
  • #13,472
Well, thanks for your reply anyway. Also the water level was measured with the endoscope as being a few centimeters above the drywell bottom. So it was quite stupid of me to imagine it could be much lower than this.
 
  • #13,473


MadderDoc said:
It is disconcerting to see in the latest helicopter footage that there has been so little apparent progress at the seaside of the plant. The building of the temporary tidal barrier seems to have come to a halt at Unit 4, and there is no indication of any progress of the steel pile barrier, the start of construction of which in the seafront of Unit 4 was announced many months ago. (If I understand the mid-term plan it is to not have a water tight barrier in place at the sea front before until some time in 2014, at the earliest).

There is groundwater inflow and outflow in basements.
Just helping disposal of radionuclides dissolved in basement water by slowly diluting them into ocean via groundwater.

Proceeding in such manner is helpful reducing storage tank hassles.
Good old Tepco already did some necessary preparations.
For example, covering seabeds around Fukushima-1 with concrete.
This delays and dilutes groundwater-supported disposal by spreading over larger area.

To be honest, wouldn't be installing a water tight barrier too early just be a big mistake?
 
  • #13,475
tsutsuji said:
http://www3.nhk.or.jp/news/genpatsu-fukushima/20120605/index.html The final version of Tepco's internal investigation report, which must be released this month, is nearly finished. [ The 2 December version was an "interim report"]. Against the cabinet investigation committee's accusation of mismanagement of the situation at units 1 and 3, it argues in defence for example that "responding was actually difficult". However the report recognizes about unit 1, that there was not enough training to cope with blackouts. About unit 3, against the cabinet investigation committee report's claim that "the risk of running out of batteries had been minimized, which led to the water injection failure", Tepco's report says "as there was a worry that the water injection equipment was damaged, it was necessary to shut it down early".

http://www.tepco.co.jp/en/press/corp-com/release/2012/1205638_1870.html Release of the Fukushima Nuclear Accidents Investigation Report (Japanese only for now)

http://www.tepco.co.jp/nu/fukushima-np/images/handouts_120619_02-j.pdf at 12:19 on 19 March an employee found 8 wounds and heard noise coming from the wounds in a gas duct of the PCV gas extraction system at unit 3. At 14:40 it was confirmed that the gas was not released outside the duct as the negative pressure was maintained. PCV pressure, PCV hydrogen concentration, PCV gas extraction system flow rate remain unchanged. As an emergency measure, the duct was repaired with tape.

http://www.tepco.co.jp/en/nu/fukushima-np/images/handouts_120619_02-e.pdf Unit 3 PCV Gas Control System Duct Damage

http://www.tepco.co.jp/en/nu/fukushima-np/images/handouts_120615_02-e.pdf The Protection Platform Installation on Unit 4 Spent Fuel Pool

( http://www.tepco.co.jp/en/nu/fukushima-np/images/handouts_120608_03-e.pdf Purpose of protection platform on unit 4 spent fuel pool - 2012-06-08 )

http://genpatsu-watch.blogspot.com/2012/06/20126191800.html (from 19 June Tepco press conference) and http://www.tepco.co.jp/nu/fukushima-np/images/handouts_120619_02-j.pdf 2/2 : A worker working to prepare the ground for the foundations of the unit 4 cover structure had his fingers (of both hands) pinched at 10:30 on 19 June when he was changing the "pit" (a part at the tip) of a boring machine. A supposedly attached casing fell down. He was sent to the unit 5/6 medical room, then to J-village and sent from J-village to a hospital in Iwaki at 12:51. It will take him 3 months to recover.
 
Last edited:
  • #13,476
tsutsuji said:
http://www.tepco.co.jp/en/press/corp-com/release/2012/1205638_1870.html Release of the Fukushima Nuclear Accidents Investigation Report (Japanese only for now)

http://www3.nhk.or.jp/news/genpatsu-fukushima/20120620/index.html Tepco released its final report. It generalises saying "As preparations against nuclear accident were complacent, pratical thinking was not sufficient". But many questions such as the cause of the large radioactive substance releases or the consequences of the earthquake remain unanswered more than one year after.

The report is based on hearing 600 people, on onsite surveys and data analysis.

There is no big difference with the interim report as regards the accident's causes, and it concludes: "It is impossible not to say that retrospectively there was complacency as regards tsunami estimates, and the insufficiency of preparations to resist tsunamis is the fundamental cause".

The response to the accident is evaluated as being basically appropriate as the people onsite responded desperately in a situation that exceeded assumptions. About the operation of emergency cooling equipments that the cabinet investigation committee had criticized as being inappropriate, while recognizing that there are points where preparedness was insufficient, it merely argues in defense that "response was in fact difficult".

Then it concludes, "As preparations against nuclear accident were complacent, during the response they were unable to imagine what was really happening onsite, and practical thinking was not sufficient".

Concerning the interference of the government, instructions quite out of touch of the real situation onsite were directly or indirectly given, "the plant manager was only torn between conflicting demands, and it was not a way to improve accident containing results".

The report also includes concrete proposals for the future: to study accident management under the assumption that nearly all equipment functions are lost, to complete meltdown preventing countermeasures, about the chain of command during an emergency, and the way to release information to the population.

Nuclear engineering specialist, Mr Miyano of Tokyo university says the report "is not sufficiently analysing the problems in past countermeasures and regulations". "It is questionable whether the true nature of the accident can be approached with this report only. 'concretely what should be regretted, what should be changed ?' it is necessary to extract the lessons, but it is difficult for this to be done by the accident's main protagonist Tokyo Electric alone. The conclusions must be drawn by analysing from the eyes of a third party."
 
  • #13,477


I think I've finally figured out what those dark structures at the seaside of unit 2 and Unit 1 turbine buildings really are. :-( Darned to have been so daft, thinking about it I had boxed myself in the vain hope that it might have been something to do with basic ground work to stopping contamination of the ocean, but alas, it is likely not.

In all simpleness, I believe those dark structures have been the construction sites for the sections to cover the lower east part of Unit 3, towards its turbine building. Here seen in an image from late May 2012:

http://gyldengrisgaard.eu/fuku_docs/daiichi-12-0528-01-hr_detail.jpg

And here below is a marked up view to the putative construction site for those cover sections, detail from original photo taken on February 28th 2012:

http://gyldengrisgaard.eu/fuku_docs/120313_01_detail.jpg
 
Last edited by a moderator:
  • #13,478


Tepconium-311 said:
There is groundwater inflow and outflow in basements.

Yes, since water treatment started about a year ago, the volume of water Tepco is handling has roughly doubled, corresponding to a net accumulation of about 400 m3/day, and it is too much to believe that this net inflow figure represents _only_ inflow.

Just helping disposal of radionuclides dissolved in basement water by slowly diluting them into ocean via groundwater.

Proceeding in such manner is helpful reducing storage tank hassles.
Good old Tepco already did some necessary preparations.
For example, covering seabeds around Fukushima-1 with concrete.
This delays and dilutes groundwater-supported disposal by spreading over larger area.

To be honest, wouldn't be installing a water tight barrier too early just be a big mistake?

Now groundwater-supported disposal proper is not something that happens fast, if it were only that I suppose doing something effective about the problem might wait until 2014. But I think the case is that the ground we are talking about is a landfill, now turned a radioactive dump, and under the surface it is criss-crossed with trenches, pipes and ducts -- that the area on the whole is as designed to facilitate fast liquid discharge to the ocean, and not at all a slow leaching bed. In that situation, to let on that it can wait years to put a stop to it is just disgraceful.
 
Last edited:
  • #13,479
Not much left of the upper parts of reactor 4 building now. I believe what we may be seeing in this video is dust caused by the cutting away of remaining parts of upper north-west wall.

 
Last edited by a moderator:
  • #13,480
tsutsuji said:
http://www.tepco.co.jp/nu/fukushima-np/images/handouts_120605_04-j.pdf At 20:03 on 4 June unit 4 SFP had an "airfin cooler panel alarm" ringing, and it was found that secondary circuit pump A had tripped with some traces of burning on the pump's terminal box. Pump B was started at 20:27. At 10:30 on 5 June, pump B was shut down in order to perform an inspection. As the pool temperature is expected to rise by 0.3 °C/hour, this is not considered as being a problem for pool temperature control.

http://www3.nhk.or.jp/news/genpatsu-fukushima/20120606/index.html Unit 4 SFP temperature reached 42°C at 5 PM on 6 June. As Tepco found a malfunction in the connecting part between motor and cable [that must be the terminal box] of the backup pump [that must be pump B] as well, they made repairs and restarted the pump after 6 PM, and the pool is being cooled again. Tepco explains: "as the pool is further cooled, the temperature might drop by 10°C in half or in one day".

http://www.tepco.co.jp/en/nu/fukushima-np/images/handouts_120608_02-e.pdf Pictures of the faulty pump cables.

tsutsuji said:
http://www.tepco.co.jp/nu/fukushima-np/images/handouts_120614_05-j.pdf This is about a new leak (0.5 to 1 cm above floor) in the Areva decontamination facility, which had been operated in closed loop since May 21.

This leak has been investigated: a water level meter was wrong.

http://www.tepco.co.jp/en/press/corp-com/release/2012/1205585_1870.html "The leaked water is assumed to have come from the coagulation-sedimentation equipment of the decontamination apparatus. As a result of site investigation on June 15, it is assumed that the leaking part is the interspace of the piping penetration hole on the top side of waste liquid strage tank. And also it is assumed that the water of the tank flowed out, since the water did not flow downstream by shutting down the flow regulating valve of downstream pipes due to instantaneous descent of the level meter of the tank and inflow from upper stream was continued. The integrity verification was conducted on the same day, and the problem was confirmed. The level meter has been decided to be fixed".

http://www.tepco.co.jp/en/nu/fukushima-np/images/handouts_120618_03-e.pdf "Investigation Result of the Water Leak from the Decontamination Apparatus" with pictures and diagrams giving details about the failed tank.

http://www3.nhk.or.jp/news/genpatsu-fukushima/20120626/index.html Tepco made additional measurements of unit 4's reactor building walls' tilt. Last month a tilt thought to have been caused by the bulge created by the hydrogen expolsion was found at the western wall with a measurement of a 3.3 cm tilt for 13 m of height, which was about half the limit set by the Building Standards Act. Now they found 4.6 cm for 13 m of height on the third floor on the western side. All tilts are within the limits of the Building Standards Act. Tokyo Electric says the pool is supported by other pillars, etc. that are different from the outer walls where tilting was found, and that as a result of seismic analysis, there is no seismic safety problem.

http://photo.tepco.co.jp/date/2012/201206-j/120625_02j.html pictures of the unit 4 wall measurements (Japanese version)
http://www.tepco.co.jp/cc/press/2012/1205832_1834.html press release about the new unit 4 wall measurements (Japanese version)
http://www.tepco.co.jp/cc/press/betu12_j/images/120625j0201.pdf press release attachment (Japanese version) (with diagrams, etc...) "Report dealing on a study about seismic safety taking into consideration local outer wall bulging at Fukushima Daiichi unit 4 reactor building"
 
Last edited by a moderator:
  • #13,481
tsutsuji said:
http://www3.nhk.or.jp/news/genpatsu-fukushima/20120626/index.html Tepco made additional measurements of unit 4's reactor building walls' tilt. Last month a tilt thought to have been caused by the bulge created by the hydrogen expolsion was found at the western wall with a measurement of a 3.3 cm tilt for 13 m of height, which was about half the limit set by the Building Standards Act. Now they found 4.6 cm for 13 m of height on the third floor on the western side. All tilts are within the limits of the Building Standards Act. Tokyo Electric says the pool is supported by other pillars, etc. that are different from the outer walls where tilting was found, and that as a result of seismic analysis, there is no seismic safety problem.

Any words on measuring error? Or was there actual change between one measurement and the next?
 
  • #13,482
SteveElbows said:
Not much left of the upper parts of reactor 4 building now. I believe what we may be seeing in this video is dust caused by the cutting away of remaining parts of upper north-west wall.



Quite so. I wonder if anything of that can be seen on the newly-shielded radiation counters at the site boundary.
EDIT: I stopped wondering and started looking
http://www.tepco.co.jp/en/nu/fukushima-np/f1/images/2012monitoring/f1_lgraph-e.gif
lo and behold, there is a slight uptick starting on 6/23 or thereabouts.
 
Last edited by a moderator:
  • #13,483
zapperzero said:
Quite so. I wonder if anything of that can be seen on the newly-shielded radiation counters at the site boundary.
EDIT: I stopped wondering and started looking
http://www.tepco.co.jp/en/nu/fukushima-np/f1/images/2012monitoring/f1_lgraph-e.gif
lo and behold, there is a slight uptick starting on 6/23 or thereabouts.

I don't see the uptick, and I'm usually pretty good at spotting graphical subtleties. I wouldn't expect much because unit 4 wasn't very radioactive in the first place, and all (or almost all) the dust will be from concrete that hasn't seen the outside world since it was poured during construction.
 
  • #13,484
Joffan said:
I don't see the uptick.

Look again :cool:. The detector near the main building shows the most visible trend. You can also get the data in the tables (on the same page) and play with it. There might be another cause, of course, such as high winds.
 
  • #13,485
zapperzero said:
Any words on measuring error? Or was there actual change between one measurement and the next?

They are not measuring the same measurement points. The new measurement with the 46 mm horizontal difference is located on the 3rd floor, halfway between the rows R6 and R7, while the older measurement of "approx. 33 mm" for "West 2" in http://www.tepco.co.jp/en/nu/fukushima-np/images/handouts_120525_05-e.pdf 6/17, was located on the same floor but exactly on row R6.

There might be a small change of 1 mm between both measurements on west2/R6-3rd floor as the report now says 32 mm (instead of "approx. 33 mm").

I attach translations of the bottom of page 7/57 and of page 9/57 of http://www.tepco.co.jp/cc/press/betu12_j/images/120625j0201.pdf

page 7/57
attachment.php?attachmentid=48655&stc=1&d=1340784216.jpg

page 9/57
attachment.php?attachmentid=48656&stc=1&d=1340784216.png

attachment.php?attachmentid=48658&stc=1&d=1340785808.png
 

Attachments

  • unit 4 bulge 07of57 b.jpg
    unit 4 bulge 07of57 b.jpg
    56.6 KB · Views: 820
  • unit 4 bulge 09of57 a.png
    unit 4 bulge 09of57 a.png
    22 KB · Views: 811
  • unit 4 bulge 09of57 b.png
    unit 4 bulge 09of57 b.png
    39 KB · Views: 821
Last edited:
  • #13,486
The camera zoomed in further when they did the next days cutting operation on east upper wall:



I'm more interested in how the painfully slow debris-removal is going at reactor 3, but cranes & stack tower tend to obscure the view of that, and we need a better resolution anyway.
 
Last edited by a moderator:
  • #13,487
Highest radiation found at Fukushima No.1 reactor

http://www3.nhk.or.jp/daily/english/20120628_01.html
 
Last edited by a moderator:
  • #13,488
LabratSR said:
Highest radiation found at Fukushima No.1 reactor

http://www3.nhk.or.jp/daily/english/20120628_01.html

After all those months, with reams of stories told potentially elevating the information level of journalists and the lay public ...still to the NHK writer of http://www.gyldengrisgaard.eu/fuku_docs/nhk20120628_01.pdf -- inside or outside the reactor, a pressure vessel, a containment, or a suppression chamber -- are all just one porridge.

Even as regards the most interesting angle apparently to the writer -- the alleged record breaking radiation, there appears to be no memory of any previous potential record-holder (although in reporting of record breaking the dethroned party and the previous record traditionally get a mention). Has the measured >10,000 mSv/hr at the vent/SGTS pipe to the Unit1+2 exhaust stack last July been forgotten?
http://www.gyldengrisgaard.eu/fuku_docs/110805_1_detail.jpg​
 
Last edited by a moderator:
  • #13,489
SteveElbows said:
The camera zoomed in further when they did the next days cutting operation on east upper wall:



I'm more interested in how the painfully slow debris-removal is going at reactor 3, but cranes & stack tower tend to obscure the view of that, and we need a better resolution anyway.


Much of the unit3 debris removal has gone on at ground level, and around the building in a rather big radius -- the Unit 3 explosion was a very littering event indeed.

Comparing this June 18th 2012 photo, with this September 15th 2011 photo it can be seen that quite some progress has been made as regards getting close to the building proper as well as apparently establishing a foothold, a heavy duty elevated working platform at the east wall of the upper floors. I'd expect some of the equipment used currently at unit 4 will be relocated to unit 3 in time.
 
Last edited by a moderator:
  • #13,490
LabratSR said:
Highest radiation found at Fukushima No.1 reactor

http://www3.nhk.or.jp/daily/english/20120628_01.html

http://photo.tepco.co.jp/en/date/2012/201206-e/120627_01e.html
http://www.tepco.co.jp/en/nu/fukushima-np/images/handouts_120627_02-e.pdf

- Isn't that radiation a bit high compared to the water drawn from the T/B basement for decontamination?
- Why is the radiation decreases underwater?
 
Last edited by a moderator:
  • #13,491
Rive said:
- Why is the radiation decreases underwater?
The water blocks radiation so it is suggest that the radiation source is somewhere out of the water
 
  • #13,492
elektrownik said:
The water blocks radiation so it is suggest that the radiation source is somewhere out of the water

As it was suggested elsewhere maybe it's the torus.

If the torus itself is watertight and the cooling water escapes where the torus connected to the DW then the water inside the torus might be there from the very first days -> much more heavily contaminated than the water drawn from the T/B basements.
 
  • #13,493
elektrownik said:
The water blocks radiation so it is suggest that the radiation source is somewhere out of the water
Why then radiation increases strongly when approaching water?
Doesn't this indicate water surface emitting high radiation?

Rive said:
As it was suggested elsewhere maybe it's the torus.

If the torus itself is watertight and the cooling water escapes where the torus connected to the DW then the water inside the torus might be there from the very first days -> much more heavily contaminated than the water drawn from the T/B basements.
Sadly shielding obstacles like walking girders aren't shown in Tepco presentation chapter 3 to help explain radiation measurements. They are only indicated in chapter 2.
If torus is watertight, wouldn't radiation increase less sharply when approaching water surface?

Any expert ready to comment?
 
  • #13,494
Tepconium-311 said:
Why then radiation increases strongly when approaching water?
Doesn't this indicate water surface emitting high radiation?


Sadly shielding obstacles like walking girders aren't shown in Tepco presentation chapter 3 to help explain radiation measurements. They are only indicated in chapter 2.
If torus is watertight, wouldn't radiation increase less sharply when approaching water surface?

Any expert ready to comment?

Time, distance and shielding are the watchwords for assessing radiation doses.

Distance: If the water is contaminated, approaching it would result in increasing radiation. If the trus is the source and you are getting clo=ser to it as you approach the water, the same applies.

Shielding: As you get closer to the water you may be going into an area with less shielding. The torus itself is partly above the water level. Any contamination in the atmosphere of the torus or deposited on the structures inside the torus has only the thin shell of the torus as shielding. Core debris inside the containment may be creating radiation streams near the vents between the containment and torus.

Time: has any pumping operation been done which could have stirred up contamination? Does the radiation level change over time (other than decay) showing priods of increase and decrease?

If there is information on the makeup of the radiation (by isotope) or much more detailed geometry information you may start to chip away at this problem. Good luck.
 
  • #13,495
Dear NUCENG, thank you for reply!

If I understand you correctly, published Tepco data only reveals high radioactivity in torus room, but not where it is from.
Your explanation sounds really convincing that there is something dangerous in torus, torus vents or nearby.

But, another thing I don't understand yet.
Somebody mentioned (iirc) that torus room of unit 1 is above groundwater level.
If this is correct, then this cannot be groundwater.

Can there be other paths for cooling water to reach basements than via leak in torus?
Because, if torus is watertight, how can there be so much radioactive water in reactor and turbine buildings' basements??

Sounds contradictory to me.
So, in other words, is there any real chance that torus is _not_ damaged?
 
  • #13,496
What kind of radiation are they measuring?
 
  • #13,497
Regarding the reactor 1 torus room, is it fair to say that we should be considering some corium blowdown into the torus room as a possibility here? High radiation readings and TEPCOs typically understated comments about 'sediment' tempt me to wander in that direction, especially given the smaller physical size of reactor 1 containment and the length of time it went without water injection.
 
  • #13,498
Tepconium-311 said:
Can there be other paths for cooling water to reach basements than via leak in torus?
Because, if torus is watertight, how can there be so much radioactive water in reactor and turbine buildings' basements??

Sounds contradictory to me.
So, in other words, is there any real chance that torus is _not_ damaged?

At least one study of mark 1 containment failure mentions the blowdown that I was just talking about. I wil try to find the study, but in a nutshell this process does not have to involve the torus itself being damaged. Rather core material that is splattered across the floor of containment eats away at the steel wall near to where it meets the steel floor, and gets into the space between the concrete and the large pipes (downcomers?) that connect containment to torus. This offers a pathways whereby core material can get into the torus room, without having to pass through the torus itself. This would also open up a pathway through which water injected into containment later on could get to the torus room.

There may be some technical inaccuracies in this description but its the best I can offer without having the report to hand.

Of course I do not mean to suggest that we now have anything like solid proof that this happened, just that we should consider it as a possibility given the survey.
 
Last edited:
  • #13,499
Having now watched the video and seen how much material they disturbed with the probes, I would like to retract by comment about the sediment.
 
  • #13,500
The 7th mid long term meeting was held on 25 June: http://www.meti.go.jp/earthquake/nuclear/20120625_02.html

The 6th meeting (25 May 2012) : https://www.physicsforums.com/showpost.php?p=3933442&postcount=13399

The 5th meeting (23 April 2012) : https://www.physicsforums.com/showpost.php?p=3881074&postcount=12979

The 4th meeting (28 March 2012) : https://www.physicsforums.com/showpost.php?p=3838108&postcount=12764

The 3rd meeting (27 February 2012) was translated into English on Tepco's website : http://www.tepco.co.jp/en/nu/fukushima-np/roadmap/conference-e.html

25 June 2012 government-Tokyo Electric mid and long term response committee, steering committee (7th meeting)

http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02a.pdf Agenda
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02b.pdf Participants

Document 1
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02c.pdf Abstract of the proceedings of 6th steering committee meeting

Document 2: Plant status
Document 2-1: Plant status
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02d.pdf Plant parameters
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02e.pdf Accumulated water storage status

Document 3 Study and execution of each special plan

3-1 Cooling by closed loop water injection
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02f.pdf Schedule
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02g.pdf Unit 2 alternative thermometers installation progress status

3-2 Treatment of accumulated water
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02h.pdf Schedule
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02j.pdf Status of multinuclide removal facility (ALPS) qualification test and installation works, and characteristics of waste objects
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02k.pdf Subdrain purification test report
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02m.pdf Progress status of construction of underground water storage tanks
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02n.pdf Progress status of ground water bypass study

3-3 Countermeasures to reduce environmental radiations
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02p.pdf Schedule
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02q.pdf Management of debris, cut down trees, generated by the response to the accident
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02r.pdf Countermeasures against fire of cut down trees (branches, leaves and roots) during the summer season, and future plans.
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02s.pdf Suitability tests of decontamination techniques within plant premises
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02t.pdf Consequences on water quality of the covering of the sea floor in the harbour (as of June)
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02u.pdf Results of evaluation of additional releases from reactor building's primary containment vessels
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02v.pdf Results of yearly radiation exposure at the plant premises boundary (as of June)

3-4 Improvement of working conditions
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02w.pdf Schedule

3-5 Countermeasures for spent fuels pools
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02x.pdf Schedule
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02y.pdf Debris removal work, reactor building top part, unit 3
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02z.pdf Debris removal work, reactor building top part, unit 4
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02aa.pdf Results of seismic safety study taking into consideration local outer wall bulging at Fukushima Daiichi unit 4 reactor building
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02bb.pdf Performance of preliminary underwater surveys (2nd and 3rd ones) in spent fuel pool for the purpose of removing debris at unit 3.
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02cc.pdf Performance of dry cask temporary storage facility construction work
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02dd.pdf Results of survey inside Fukushima Daiichi unit 2 reactor building (3rd ~ 5th floors)

3-6 Preparations for fuel debris removal
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02ee.pdf Schedule
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02ff.pdf Performance of survey into unit 1's torus room

3-7 treatment and disposal of radioactive waste
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02gg.pdf Schedule
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02hh.pdf Status of contaminated water analysis
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02jj.pdf Collection of samples to analyse debris and cut down trees

Document 4
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02kk.pdf roadmap progress (abstract)

Document 5
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_02mm.pdf Violations of safety regulations reflected in the first fiscal 2011 safety inspection at Fukushima Daiichi nuclear power plant (additional instructions)

25 June 2012 government-Tokyo Electric mid and long term response committee, technical development progress headquarters (7th meeting) (http://www.meti.go.jp/earthquake/nuclear/20120625_01.html )

http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_01a.pdf Agenda

Document 1
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_01b.pdf Abstract of the proceedings of 6th meeting

Document 2
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_01c.pdf Decided projects for the global radiation reduction plan

Document 3
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_01d.pdf Securing education and human resources as seen from the mid and long term perspective

Document 4
http://www.meti.go.jp/earthquake/nuclear/pdf/120625/120625_01e.pdf Organization of the "Fukushima Workshop" (provisional name) on development of machinery and equipments etc. toward the decommissioning of Tokyo Electric Power Company (K.K.) Fukushima Daiichi nuclear power plant
 

Similar threads

  • · Replies 12 ·
Replies
12
Views
49K
  • · Replies 41 ·
2
Replies
41
Views
5K
  • · Replies 2K ·
60
Replies
2K
Views
451K
  • · Replies 5 ·
Replies
5
Views
6K
  • · Replies 2 ·
Replies
2
Views
2K
  • · Replies 6 ·
Replies
6
Views
20K
  • · Replies 763 ·
26
Replies
763
Views
274K
  • · Replies 38 ·
2
Replies
38
Views
16K
Replies
6
Views
4K
  • · Replies 4 ·
Replies
4
Views
11K