The strontium leak:
http://www.tepco.co.jp/en/press/corp-com/release/11120806-e.html Report on response to the accident due to the leakage of water containing radioactive materials at the water desalination (evaporative concentration apparatus) of Fukushima Daiichi Nuclear Power Station to NISA. (24 pages, English) ("it will take nearly one month to obtain result of the analysis of Strontium in the leaked water")
"Concept of Securing the Mid-Term Safety":
http://www3.nhk.or.jp/news/genpatsu-fukushima/20111209/1700_hoanin.html The NISA has approved Tepco's mid term safety plan for the next 3 years. The NISA heard the opinions of specialists at a meeting on 9 December. Some specialists expressed the view that more should be done to find out the fuel condition "such as using infrared measurements", but the NISA said that as an urgent response, the plan was valid. Kazuhiko Kudo of Kyushu university said "only minimal safety countermeasures are implemented, and more efforts should be done to secure safety ". The NISA must then report the plan to the NSC, and upon NSC approval, all the conditions for completion of "step 2" are met.
http://www.tepco.co.jp/en/press/corp-com/release/11120814-e.html Report with regards to "Policy on the mid term security" for the Units 1 to 4 of Fukushima Daiichi Nuclear Power Station to Nuclear and Industrial Safety Agency at the Ministry of Economy, Trade and Industry (part 2) (8 December 2011, English press release linking to a 159 page Japanese report)
http://www.tepco.co.jp/en/press/corp-com/release/11120701-e.html Report with regards to "Policy on the mid term security" for the Units 1 to 4 of Fukushima Daiichi Nuclear Power Station to Nuclear and Industrial Safety Agency at the Ministry of Economy, Trade and Industry (part 1) (revision 2) (7 December, English press release linking to Japanese report)
http://www.tepco.co.jp/en/press/corp-com/release/11110912-e.html Report with regard to "Policy on the mid term security" for the Units 1 to 4 of Fukushima Daiichi Nuclear Power Station to Nuclear and Industrial Safety Agency at the Ministry of Economy, Trade and Industry (part 1) (revision 1) (9 November, English press release linking to Japanese report)
http://www.tepco.co.jp/cc/press/11101702-j.html Report with regard to "Policy on the mid term security" for the Units 1 to 4 of Fukushima Daiichi Nuclear Power Station to Nuclear and Industrial Safety Agency at the Ministry of Economy, Trade and Industry (part 1) (17 October, Japanese)
http://www.nisa.meti.go.jp/english/press/2011/10/en20111020-2.pdf Regarding the Receipt of Report from TEPCO and Holding Hearings on “The Concept of Securing the Mid-Term Safety” for Units 1 to 4 at Fukushima Dai-ichi Nuclear Power Station, Tokyo Electric Power Co., Inc.(October 17, 2011, English)
http://www.nisa.meti.go.jp/english/press/2011/10/en20111019-2.html Regarding the Direction on “The Concept of Securing the Mid-Term Safety” for Units 1 to 4 at Fukushima Dai-ichi Nuclear Power Station, Tokyo Electric Power Co., Inc. (October 3, 2011, English)