Calculating Water Pumping Requirements for River-to-Dam System

  • Thread starter Thread starter pushpull
  • Start date Start date
  • Tags Tags
    Calculation Water
AI Thread Summary
To calculate the pumping requirements for a river-to-dam system, the total head needed from the pump must account for the elevation gain of 100 meters and any additional head loss due to friction in the 25 km concrete-lined steel pipe. The required flow rate is 100 megalitres per day, which necessitates determining the appropriate pipe size to manage velocity and minimize head loss. Electrical power requirements will depend on the total head and flow rate, following the pump power formula. It's essential to know the elevation of the dam to accurately calculate the total head. Providing preliminary calculations or attempts is encouraged for ethical assistance.
pushpull
Messages
2
Reaction score
0
How is following calculated ?
Pumping water from river, up a hill 100 metres high, it then runs downhill into a dam.
Need to deliver 100 megalitres a day, the pipe will be concrete lined steel and the distance about 25 km.
What is total head required from the pump and what is the electrical power needed.
 
Engineering news on Phys.org
Is this homework? You will have to show what you've tried so far, because it's not ethical for us to simply solve the problem for you.

And you need to know what the elevation of the dam is too...
 
Agreed with Mech. btw you're also going to need a pipe size for velocity and subsequent head loss calcs.
 
How did you find PF?: Via Google search Hi, I have a vessel I 3D printed to investigate single bubble rise. The vessel has a 4 mm gap separated by acrylic panels. This is essentially my viewing chamber where I can record the bubble motion. The vessel is open to atmosphere. The bubble generation mechanism is composed of a syringe pump and glass capillary tube (Internal Diameter of 0.45 mm). I connect a 1/4” air line hose from the syringe to the capillary The bubble is formed at the tip...
Thread 'Physics of Stretch: What pressure does a band apply on a cylinder?'
Scenario 1 (figure 1) A continuous loop of elastic material is stretched around two metal bars. The top bar is attached to a load cell that reads force. The lower bar can be moved downwards to stretch the elastic material. The lower bar is moved downwards until the two bars are 1190mm apart, stretching the elastic material. The bars are 5mm thick, so the total internal loop length is 1200mm (1190mm + 5mm + 5mm). At this level of stretch, the load cell reads 45N tensile force. Key numbers...
I'd like to create a thread with links to 3-D Printer resources, including printers and software package suggestions. My motivations are selfish, as I have a 3-D printed project that I'm working on, and I'd like to buy a simple printer and use low cost software to make the first prototype. There are some previous threads about 3-D printing like this: https://www.physicsforums.com/threads/are-3d-printers-easy-to-use-yet.917489/ but none that address the overall topic (unless I've missed...
Back
Top