- #1
Kutt
- 237
- 1
After the Chernobyl NPP was fully and permanently shut down in 2000, did they remove the fuel from reactors 1-3 as well as from the spent fuel pools?
Construction on reactors 5-6 was canceled after the meltdown in 1986.
Construction on reactors 5-6 was canceled after the meltdown in 1986.
Last edited: