How Can I Calculate RPM and Torque for Different Bottling Line Speeds?

  • Thread starter Thread starter Dopeylass
  • Start date Start date
  • Tags Tags
    Rpm Torque
AI Thread Summary
To calculate the RPM and torque for the bottling line, the motor's RPM can be determined using the formula RPM = (v*60)/(D*Pi), where v is the desired velocity in feet per second and D is the diameter in feet. The current bottling speed is 0.2 meters per second, with a maximum desired speed of 4 meters per second. The capping machine limits production to 2,000 bottles per hour, and the total weight on the line is estimated at 55 kg. It's suggested to use conveyor design software for more precise calculations. Understanding the setup through diagrams and photos may also aid in the process.
Dopeylass
Messages
2
Reaction score
0
I need help working out the RPM of the motor/gearbox and torque from the following details:
The temporary drive rigged up is running at 0.2 metres a second, which is a little faster than the speed we usually ran our broken Lenze drive. We bottle 2 sizes of glass bottle, 1 litre and 1/4 litre. The speed of our capping machine limits us to 2,000 bottles an hour (33 bottle/min). We would like to be able to go from about 0.15 metres/sec to about 4 metres/sec. I don't have any torque figures for the broken motor, but I estimate the maximum weight of bottles on the bottling line to be 30 kg and the chain conveyer is 25 kg.

If anyone knows how to work out the speed and torque from the above information please let me know as i am getting pretty desperate, as i need to order an alternative geared motor before the temporary one breaks.
 

Attachments

  • 100_1507.jpg
    100_1507.jpg
    60.1 KB · Views: 557
Last edited:
Engineering news on Phys.org
I think it's safe to say we need some kind of diagram showing the set up.
 
I have photos's of the conveyor
 
If I understand your question correctly, you want to find the RPM of a motor to that will give you a tangential speed of 4 m/s right?

If so (and if my memory serves me correctly), you can find the RPM using the general formula,

RPM = (v*60)/D*Pi)

where,

v = velocity, ft/sec
D = diameter, ft

This will give you the RPM's required to obtain the desired tangential speed. The diameter is assumed to be measured from the center of the circle (or gear where the motor is coupled).

A quick Google on conveyor belt design returned lots of software that you could use instead of trying to figure it out with hand calcs.

http://www.helixtech.com.au/T5Main.htm

Hope this helps.

CS
 
Thread 'Physics of Stretch: What pressure does a band apply on a cylinder?'
Scenario 1 (figure 1) A continuous loop of elastic material is stretched around two metal bars. The top bar is attached to a load cell that reads force. The lower bar can be moved downwards to stretch the elastic material. The lower bar is moved downwards until the two bars are 1190mm apart, stretching the elastic material. The bars are 5mm thick, so the total internal loop length is 1200mm (1190mm + 5mm + 5mm). At this level of stretch, the load cell reads 45N tensile force. Key numbers...
I'm trying to decide what size and type of galvanized steel I need for 2 cantilever extensions. The cantilever is 5 ft. The space between the two cantilever arms is a 17 ft Gap the center 7 ft of the 17 ft Gap we'll need to Bear approximately 17,000 lb spread evenly from the front of the cantilever to the back of the cantilever over 5 ft. I will put support beams across these cantilever arms to support the load evenly
Back
Top