Projectile Motion: Calculating Parcel Time and Car Speed

AI Thread Summary
To determine the time it takes for the parcel to hit the ground, the vertical motion must be analyzed first, using the equation d = v1*t + (1/2)at^2 with an initial vertical velocity of 0. The parcel falls 1.5 meters, allowing for the calculation of the time it takes to reach the ground. Once the time is established, it can be used to find the horizontal velocity by relating it to the horizontal distance of 12 meters. The speed of the car before the collision can then be estimated based on the horizontal velocity of the parcel. This approach effectively combines both vertical and horizontal motion principles in projectile motion.
whitestrat69
Messages
12
Reaction score
0

Homework Statement


A car collides with a brick wall and comes to rest.
A parcel which was on top of the roof at the time becomes detached. It is initially traveling horizontally and it strikes the ground a distance of 12m from the point where it left the car. The parcel is initially 1.5 m above ground.

What period of time elapses before the parcel strikes the ground?

Estimate the speed of the car just before it collided with the wall?

Homework Equations


s=ut+1/2at^2
v=u+at
v^2=u^2+2as

The Attempt at a Solution


i have no idea where to start, ??
 
Last edited:
Physics news on Phys.org
You need the velocity with which the car collided?

How long does it take the parcel to fall 1.5m?

Use this time with the 12m to get the horizontal velocity.
 
yes, that's what i initially thought as iv'e tried working this out... the velocity was not provided..?
 
whitestrat69 said:
yes, that's what i initially thought as iv'e tried working this out... the velocity was not provided..?

can you show your steps? what was the answer given?
 
no it wasnt, i haven't made any sufficient steps..
 
whitestrat69 said:
no it wasnt, i haven't made any sufficient steps..

First step, find the time it takes to drop 1.5m.

this is the vertical direction. initial vertical velocity = 0

try to apply:

d = v1*t + (1/2)at^2

to this situation.
 
thankyou!:smile:
 
whitestrat69 said:
thankyou!:smile:

no prob.
 
Back
Top