How Is Work Calculated on a Slope with Deceleration?

  • Thread starter Thread starter MathewsMD
  • Start date Start date
  • Tags Tags
    Velocity Work
AI Thread Summary
The discussion focuses on calculating the work done by a man pushing an 80-N crate up a frictionless slope at a 30° angle. Initially, the work was calculated based on potential energy, assuming constant speed, leading to a result of 200 J. However, the scenario changed to include deceleration at 1.5 m/s², prompting a reevaluation of the work calculation. The key point is that the work done must account for the force exerted by the man in relation to the changing speed of the crate. The conversation emphasizes the need to clarify the correct approach to calculating work in the context of varying acceleration.
MathewsMD
Messages
430
Reaction score
7
A man pushes an 80-N crate a distance of 5.0 m upward along a frictionless slope that makes an angle of 30◦ with the horizontal. The force he exerts is parallel to the slope. If the speed of the crate is constant, then the work done by the man is:

Attempt: Since gravity is a conservative force, and there is no nonconservative forces, then mgh = U. Therefore, since h = 5sin30 m, then the work done is the change in potential energy, right? Since you are working against gravity, with the direction of motion, work is positive. Also, I am not sure how to specifically work with a varying force (changing acceleration) in this case so I chose to use conservative forces.

W = (80 N)(5sin30 m)
W = 200 J

Although this is incorrect. I am unsure if I have made any errors, so any pointers would be helpful. Also, and guidance with this question would be greatly appreciated! :)
 
Physics news on Phys.org
It is odd that you titled this "Work with changing velocity" while the problem specifies the "If the speed of the crate is constant"! It is, however, true that the work required to lift a mass is just the weight of the mass times the height lifted. Now, why do you say "this is incorrect"?
 
Sorry, here's the correct question.

A man pushes an 80-N crate a distance of 5.0 m upward along a frictionless slope that makes an angle of 30◦ with the horizontal. His force is parallel to the slope. If the speed of the crate decreases at a rate of 1.5m/s2, then the work done by the man is:

My attempt at the solution is still the same
 
Last edited:
Work = force * distance. If distance = r, then Work is the integral of Force*dr.
 
MathewsMD said:
Sorry, here's the correct question.

A man pushes an 80-N crate a distance of 5.0 m upward along a frictionless slope that makes an angle of 30◦ with the horizontal. His force is parallel to the slope. If the speed of the crate decreases at a rate of 1.5m/s2, then the work done by the man is:

My attempt at the solution is still the same
First figure out the force with which the man pushes.
 
Thread 'Variable mass system : water sprayed into a moving container'
Starting with the mass considerations #m(t)# is mass of water #M_{c}# mass of container and #M(t)# mass of total system $$M(t) = M_{C} + m(t)$$ $$\Rightarrow \frac{dM(t)}{dt} = \frac{dm(t)}{dt}$$ $$P_i = Mv + u \, dm$$ $$P_f = (M + dm)(v + dv)$$ $$\Delta P = M \, dv + (v - u) \, dm$$ $$F = \frac{dP}{dt} = M \frac{dv}{dt} + (v - u) \frac{dm}{dt}$$ $$F = u \frac{dm}{dt} = \rho A u^2$$ from conservation of momentum , the cannon recoils with the same force which it applies. $$\quad \frac{dm}{dt}...
I was thinking using 2 purple mattress samples, and taping them together, I do want other ideas though, the main guidelines are; Must have a volume LESS than 1600 cubic centimeters, and CAN'T exceed 25 cm in ANY direction. Must be LESS than 1 kg. NO parachutes. NO glue or Tape can touch the egg. MUST be able to take egg out in less than 1 minute. Grade A large eggs will be used.
Back
Top