The discussion revolves around the feasibility and structural considerations of designing an addition with a cantilevered balcony. Participants explore the implications of weight distribution, foundation requirements, and design choices related to the balcony's structure.

Discussion Character

  • Technical explanation
  • Debate/contested
  • Mathematical reasoning

Main Points Raised

  • One participant questions the physical possibility of the cantilevered balcony design, specifically regarding the long span and foundation support.
  • Another participant suggests that the design may be overengineered compared to the existing building's foundation.
  • A participant clarifies the intended use of the balcony for employee breaks and acknowledges the design's overengineering as a stylistic choice.
  • Concerns are raised about the differences in foundation types between the existing structure and the new addition.
  • One participant provides calculations indicating the addition's dead weight of approximately 82,000 lbs and inquires about determining the appropriate size for the footings based on this weight and cantilever considerations.
  • A response highlights the variability of soil bearing capacities and emphasizes the need for a structural engineer to assess local conditions and codes. It also outlines a method for estimating foundation size based on load and soil pressure.

Areas of Agreement / Disagreement

Participants express differing views on the design's adequacy and the necessity of engineering expertise. There is no consensus on the specific foundation requirements or the implications of the cantilevered design.

Contextual Notes

Limitations include the unknown bearing capacity of the soil and the lack of detailed calculations for the foundation's design. The discussion also reflects varying interpretations of the existing foundation's adequacy.

ahunter
Messages
3
Reaction score
0
I am designing an addition with a cantilevered balcony and am wondering if it is physically possible. the deck is 24' long with 12' extended past I will be using W12 x 96 (massive) it will be held up with two rows of columns that are 12' apart. my question is if the foundation of the columns are heavy/deep enough will the long span be a problem?
see atacment
 

Attachments

Engineering news on Phys.org


Hello ahunter an welcome.

What is your balcony for? a Helipad?

It seems a tad overdesigned compared to what I take to be the existing building wall and its foundation on the left.
 


underneath the part that isn't cantilevered will be three offices and the balcony will be for employees to take breaks and have our company grill outs. It is a bit overdesigned, and we were going for that look just to be different.
 


That doesn't explain the difference between what seems to be a simple srip foundation at the base of the (existing?) wall on the left and what appear to be bored pile foundations for the new flat roof.
 


the new foundaion is just there right now to show where it will be (size not correct). I have calculated the adition to weigh around 82,000 lbs (dead weight) and it will be suported by six (8 5/8 dia x 1/4"wall) columns. with a foundation for each of them. my question is how to caculate what the size of the footings will need to be for this weight and the cantilever.
 


I have absolutely no idea of the bearing capacity of your soil. Soil capacities vary greatly from less than half a ton per square foot for loose soil to over 100 tons per square foot for solid rock.

Particularly since this project is for acompany and employees you need to get a competent structural engineer, who knows local conditions and codes, to advise.

To get an idea of the foundation size take the weight on any column and divide by its area to get the foot pressure.

Now imagine this spreads out at 45 degrees from this level. As the area increases the load remains the same, so the pressure decreases. At some point this pressure equals to bearing competency of the soil.
This is your foundation level. You will need a block of concrete to fill the space between this level and the foot of the column. The area of the concrete block obviously equals the weight on the column divided by the allowable bearing pressure on your soil.
 

Similar threads

Replies
1
Views
10K
  • · Replies 5 ·
Replies
5
Views
3K
  • · Replies 15 ·
Replies
15
Views
4K
  • · Replies 67 ·
3
Replies
67
Views
7K
Replies
2
Views
2K
  • · Replies 9 ·
Replies
9
Views
3K
Replies
1
Views
2K
  • · Replies 52 ·
2
Replies
52
Views
8K
  • · Replies 2 ·
Replies
2
Views
2K
  • · Replies 23 ·
Replies
23
Views
6K