Can 1 1/4 NPT Thread Hold 10,000 PSI?

  • Thread starter Thread starter barvas11
  • Start date Start date
  • Tags Tags
    Psi Thread
AI Thread Summary
A 1 1/4 NPT thread can potentially hold 10,000 PSI, but its pressure rating is primarily determined by the overall dimensions and material of the fitting rather than the thread itself. The ASME B16.11 standard indicates that a Class 6000 fitting matches the pressure rating of a Schedule XXS pipe, which may reach 10,000 PSI depending on the material. It is important to verify the pressure rating with the supplier, as some industries may derate threaded pipes due to material removal from the threads. Additionally, piping codes require consideration of wall tolerance when assessing pressure ratings, and applying a safety factor is common practice. Ultimately, the suitability of the fitting for high pressure applications depends on these various factors.
barvas11
Messages
32
Reaction score
0
Hi Guys,
My friend is asking me to do the calculation for NPT thread. He is asking if 1 1/4 NPT thread is able to hold 10 000Psi pressure acting on it.
In my opinion there is no need to do the calculation for the thread. Of course it will hold it.
Don't quote me on this but I think that there is no difference in the way how low and high pressure npt threads are cut. High pressure fittings are more bulky due to pressure.
What are your thoughts?
 
Engineering news on Phys.org
NPT generally refers to the US style tapered thread. There is a European counterpart with both tapered and straight thread design. I presume you mean the US type.

In general, the fitting isn't limited by the thread, it is limited by the overall dimensions of the fitting. Pipe fittings can be made to almost any standard including one that the supplier comes up with, so for any pipe thread fitting you need to verify the pressure rating with the supplier or to a recognized standard. The US standard that would generally cover these is ASME B16.11. That standard states that a class 6000 threaded fitting is equal to a Sched. XXS pipe in the size given. So for a 1-1/4", Class 6000 fitting built to ASME B16.11, the fitting pressure rating is equal to a 1-1/4" pipe, schedule XXS. Depending on material, it could have a pressure rating of 10,000 psi, but you would have to check. Note it is also a function of the temperature the fitting will be operated at.
 
Hi Thanks,
That makes sense. Pressure rating of the pipe = pressure rating of the thread when it comes to NPT threads.
 
Some people/companies/industries will derate a pipe with a threaded end because the threads have removed material which would otherwise be used to resist hoop and axial stress. I don't know how common that is throughout industry, but our company does that. In fact, our company doesn't allow pipe less than sched 80 to be threaded. Thinner walled pipe must be welded. Note also that the piping codes require that you take wall tolerance into account when determining pressure rating.
 
Yeah those scheduled pipes are not accurate but we always apply 1.5 safety factor to anything that is under pressure.
 
Hi all, I have a question. So from the derivation of the Isentropic process relationship PV^gamma = constant, there is a step dW = PdV, which can only be said for quasi-equilibrium (or reversible) processes. As such I believe PV^gamma = constant (and the family of equations) should not be applicable to just adiabatic processes? Ie, it should be applicable only for adiabatic + reversible = isentropic processes? However, I've seen couple of online notes/books, and...
Thread 'How can I find the cleanout for my building drain?'
I am a long distance truck driver, but I recently completed a plumbing program with Stratford Career Institute. In the chapter of my textbook Repairing DWV Systems, the author says that if there is a clog in the building drain, one can clear out the clog by using a snake augur or maybe some other type of tool into the cleanout for the building drain. The author said that the cleanout for the building drain is usually near the stack. I live in a duplex townhouse. Just out of curiosity, I...
I have an engine that uses a dry sump oiling system. The oil collection pan has three AN fittings to use for scavenging. Two of the fittings are approximately on the same level, the third is about 1/2 to 3/4 inch higher than the other two. The system ran for years with no problem using a three stage pump (one pressure and two scavenge stages). The two scavenge stages were connected at times to any two of the three AN fittings on the tank. Recently I tried an upgrade to a four stage pump...

Similar threads

Back
Top