Can Increasing Pipe Diameter Enhance Home Water Cooling Systems?

AI Thread Summary
Increasing the pipe diameter from 1 inch to 2 inches in a home water cooling system is intended to reduce fluid velocity and enhance cooling time. Insulation is crucial to protect the evaporator from sunlight, with recommendations including fiberglass wrap with aluminum foil or cold water pipe wraps available at home improvement stores. Concerns about potential blockage when the pump is off suggest the need for a flow sensor connected to a controller to manage the system effectively. Additionally, implementing a temperature controller can prevent freezing in the system. Proper insulation and control mechanisms are essential for optimizing the performance of the cooling system.
Mechatronics
Messages
2
Reaction score
0
Hello,

First of all, i would like to introduce myself to Physics Forums. I am a Mechatronics Engineering Graduate. Me and my friend have a small project for the house, since we live in a hot area, we decided to design something to cool water at home. We came up with an idea which says that we have a whole refrigeration system, we will just modify the evaporator but we are not sure of what we are doing since we lack experience.

The idea is that we have a 1 inch pipe coming out of the pump, we decided to increase the diameter to 2 inch to reduce the velocity of the fluid(water) and give more time for the fluid to get cooled. The evaporator copper tubes will be covering the 2 inch copper pipe. We can calculate the heat transfer through the surfaces. My question is, what type of insulation we need to cover the evaporator to avoid exposing it to the sun lights and another question in mind as well, if the flow stopped in the pipe by switching off the pump pr any reason, is there any chance of blockage to occur since the compressor will keep on working whille the flow is zero. Is there any idea to avoid the blockage. we thought of adding flow sensor after the evaporator and connect it to a controller but i am askin if we could find easier solution.

Regards! :)
 
Engineering news on Phys.org
Welcome to PF, Mechatronics.
Russ is probably the best guy to address this question, since he's an HVAC engineer. My first thought toward the insulation problem would be a fibreglass wrap with aluminum foil as the outer layer. Haven't a clue about the rest of your problem.
One thing, though. I appreciate individualism, but using non-standard colours or fonts is rather irritating. Please use black text for future posts. :smile:
 
Thanks, Danger!

I will be waiting for Russ for clarification then, and sorry about the text color. :)
 
No worries.
We do occasionally use a different colour or size sparingly for emphasis or to post a quote from another source. Personally, I use italics for emphasis.
 
For insulation, I would look at pipe wraps you can find at Home Depot and the like, especially the kind meant for cold water pipes to prevent dripping due to cold pipes running in warm areas, i.e. condensation wrap. If these are outside, then you could put a final covering of PVC wrap to make it weather resistant.
 
Well, the question doesn't ask anything about thermodynamics, just controls, but I do know a little about that...

I'd probably put a temperature controller in there with a sensor on the pipe to prevent freezing. You'll want this anyway since if you aren't dissipating enough heat with your system, it can freeze even if the pump is on. Something like this, for example: http://www.grainger.com/Grainger/items/5TB81
 
Last edited by a moderator:
Thread 'Turbocharging carbureted petrol 2 stroke engines'
Hi everyone, online I ve seen some images about 2 stroke carbureted turbo (motorcycle derivation engine). Now.. In the past in this forum some members spoke about turbocharging 2 stroke but not in sufficient detail. The intake and the exhaust are open at the same time and there are no valves like a 4 stroke. But if you search online you can find carbureted 2stroke turbo sled or the Am6 turbo. The question is: Is really possible turbocharge a 2 stroke carburated(NOT EFI)petrol engine and...
I need some assistance with calculating hp requirements for moving a load. - The 4000lb load is resting on ball bearing rails so friction is effectively zero and will be covered by my added power contingencies. Load: 4000lbs Distance to travel: 10 meters. Time to Travel: 7.5 seconds Need to accelerate the load from a stop to a nominal speed then decelerate coming to a stop. My power delivery method will be a gearmotor driving a gear rack. - I suspect the pinion gear to be about 3-4in in...
Back
Top