When calculating the work done lifting a cable, the integral must be split because each segment of the cable is lifted different distances. In contrast, when pumping water out of a container, the limits of integration can be adjusted without needing to split the integral, as the water's center of mass is consistently at the height of the tank. For example, if a tank is 4 ft tall and you want to leave 1 ft of water, the limits can simply be changed from 0 to 3 ft. This approach simplifies the calculation of work done. Understanding these integral adjustments is crucial for accurately determining work in both scenarios.
demonelite123
Messages
216
Reaction score
0
so i know that when there is a cable hanging from say a building that is taller than the length of the cable and you want to find the work done lifting half of the cable, you have to split the integral up since each "small piece" of rope in the first half gets lifted up a variable amount while each "small piece" of rope in the 2nd half gets lifted the same amount.

now when you are finding the work done by pumping water, let's say the problem is to find the work done in pumping water out of the top of the container so that only a depth of 1 ft of water remains. would you have to split up the integral in a similar way to the cable problem described above? or could you just adjust the limits of integration accordingly. for example if the tank is 4 ft tall and the limits to find the work to pump out all the water is from 0 to 4. could you change it so that the limits become from 0 to 3 to find the work needed to pump the water out so that 1ft depth remains?
 
Physics news on Phys.org
The center of mass of the water you are pumping out has to reach the height of the tank.
 
I multiplied the values first without the error limit. Got 19.38. rounded it off to 2 significant figures since the given data has 2 significant figures. So = 19. For error I used the above formula. It comes out about 1.48. Now my question is. Should I write the answer as 19±1.5 (rounding 1.48 to 2 significant figures) OR should I write it as 19±1. So in short, should the error have same number of significant figures as the mean value or should it have the same number of decimal places as...
Thread 'Calculation of Tensile Forces in Piston-Type Water-Lifting Devices at Elevated Locations'
Figure 1 Overall Structure Diagram Figure 2: Top view of the piston when it is cylindrical A circular opening is created at a height of 5 meters above the water surface. Inside this opening is a sleeve-type piston with a cross-sectional area of 1 square meter. The piston is pulled to the right at a constant speed. The pulling force is(Figure 2): F = ρshg = 1000 × 1 × 5 × 10 = 50,000 N. Figure 3: Modifying the structure to incorporate a fixed internal piston When I modify the piston...
Thread 'A cylinder connected to a hanging mass'
Let's declare that for the cylinder, mass = M = 10 kg Radius = R = 4 m For the wall and the floor, Friction coeff = ##\mu## = 0.5 For the hanging mass, mass = m = 11 kg First, we divide the force according to their respective plane (x and y thing, correct me if I'm wrong) and according to which, cylinder or the hanging mass, they're working on. Force on the hanging mass $$mg - T = ma$$ Force(Cylinder) on y $$N_f + f_w - Mg = 0$$ Force(Cylinder) on x $$T + f_f - N_w = Ma$$ There's also...