The project involves coupling a 12V alternator with a 1.4HP engine to charge a 12V battery under a 35 Amp load, resulting in a power surplus of 623.979 Watts. The efficiency of the alternator at optimal RPM is uncertain, but the current engine and alternator setup should suffice for steady-state loads without significant starting demands. Concerns about potential overcharging of the battery and mechanical inefficiencies are noted, emphasizing the need for careful monitoring. The discussion suggests that while the numbers appear adequate, practical testing is essential to determine true performance. Overall, the setup seems viable, but efficiency and battery management require attention.
MachX
Messages
26
Reaction score
0
Hello,

I have a project that involves the coupling of a 12V Alternator with a small engine to power a loaded 12V battery.

The gas engine is 1.4HP (1043.979Watts) coupled to a 40 Amp 12V alternator which is charging a 12V battery under a 35 Amp load.

The way I see it, the 35 amp load @ 12V = 420 Watts = roughly 0.563HP. Giving the engine an advantage of 623.979 Watts greater than the required draw.

What I do not know is; what the RPM of the alternator is at is most efficient speed. However I am almost positive the engine can meet and exceed it.

Given a basic look at this, do these numbers seem to make enough sense to provide sufficient power for the system to continually work under load? Should I go with a 60A alternator instead? I know there will be losses due to mechanical inefficiency/friction But do these figures seem proportionate enough to actually put to use? What should I look out for?

Any advice greatly appreciated
 
Engineering news on Phys.org
You are asking a relevant question which has no simple answer afaik.
Generator sets are usually built as an integrated unit, with gasoline motor and alternator tuned to get the desired performance. Your setup should work as is, simply because you do not have any big starting loads such as compressor motors or pumps and it is amply sized for the steady state load. Hopefully you have provisions to avoid frying the battery by overcharging it.
However, the efficiency is indeterminate. It may be close to or far from optimal and only experiment will tell.
 
Yeah, you'll have to benchmark it. There's no easy answer to this.
 
Hi all, I have a question. So from the derivation of the Isentropic process relationship PV^gamma = constant, there is a step dW = PdV, which can only be said for quasi-equilibrium (or reversible) processes. As such I believe PV^gamma = constant (and the family of equations) should not be applicable to just adiabatic processes? Ie, it should be applicable only for adiabatic + reversible = isentropic processes? However, I've seen couple of online notes/books, and...
Thread 'How can I find the cleanout for my building drain?'
I am a long distance truck driver, but I recently completed a plumbing program with Stratford Career Institute. In the chapter of my textbook Repairing DWV Systems, the author says that if there is a clog in the building drain, one can clear out the clog by using a snake augur or maybe some other type of tool into the cleanout for the building drain. The author said that the cleanout for the building drain is usually near the stack. I live in a duplex townhouse. Just out of curiosity, I...
I have an engine that uses a dry sump oiling system. The oil collection pan has three AN fittings to use for scavenging. Two of the fittings are approximately on the same level, the third is about 1/2 to 3/4 inch higher than the other two. The system ran for years with no problem using a three stage pump (one pressure and two scavenge stages). The two scavenge stages were connected at times to any two of the three AN fittings on the tank. Recently I tried an upgrade to a four stage pump...
Back
Top