Work, Vertical and Horizontally

  • Thread starter Thread starter Bigdane
  • Start date Start date
  • Tags Tags
    Vertical Work
AI Thread Summary
The discussion focuses on calculating the work done by a person lifting a 3.7 kg cement block vertically and then carrying it horizontally. The work done in lifting the block can be calculated using the formula w = fd, where f is the force (weight of the block) and d is the distance lifted. In contrast, the work done while carrying the block horizontally is zero, as there is no vertical displacement. Gravity does negative work during the lifting process, equal to the weight of the block multiplied by the distance lifted. Understanding these principles is essential for solving similar physics problems.
Bigdane
Messages
14
Reaction score
0
A person lifts a 3.7 kg cement block a vertical distance of 1.18 m and then carries the block horizontally a distance of 7.80 m.

(a) How much work is done by the person in the process?
J

(b) How much work is done by gravity in the process?
J

w=fd?
 
Physics news on Phys.org
Bigdane said:
A person lifts a 3.7 kg cement block a vertical distance of 1.18 m and then carries the block horizontally a distance of 7.80 m.

(a) How much work is done by the person in the process?
J

(b) How much work is done by gravity in the process?
J

w=fd?

OK. How much work then in lifting?

How much in carrying?
 
im not sure how to find that
 
got it. thanks
 
I multiplied the values first without the error limit. Got 19.38. rounded it off to 2 significant figures since the given data has 2 significant figures. So = 19. For error I used the above formula. It comes out about 1.48. Now my question is. Should I write the answer as 19±1.5 (rounding 1.48 to 2 significant figures) OR should I write it as 19±1. So in short, should the error have same number of significant figures as the mean value or should it have the same number of decimal places as...
Thread 'Calculation of Tensile Forces in Piston-Type Water-Lifting Devices at Elevated Locations'
Figure 1 Overall Structure Diagram Figure 2: Top view of the piston when it is cylindrical A circular opening is created at a height of 5 meters above the water surface. Inside this opening is a sleeve-type piston with a cross-sectional area of 1 square meter. The piston is pulled to the right at a constant speed. The pulling force is(Figure 2): F = ρshg = 1000 × 1 × 5 × 10 = 50,000 N. Figure 3: Modifying the structure to incorporate a fixed internal piston When I modify the piston...
Thread 'A cylinder connected to a hanging mass'
Let's declare that for the cylinder, mass = M = 10 kg Radius = R = 4 m For the wall and the floor, Friction coeff = ##\mu## = 0.5 For the hanging mass, mass = m = 11 kg First, we divide the force according to their respective plane (x and y thing, correct me if I'm wrong) and according to which, cylinder or the hanging mass, they're working on. Force on the hanging mass $$mg - T = ma$$ Force(Cylinder) on y $$N_f + f_w - Mg = 0$$ Force(Cylinder) on x $$T + f_f - N_w = Ma$$ There's also...

Similar threads

Back
Top