Are Nuclear Engineers Still Innovating Despite Few New Plants Being Built?

In summary: There are a lot of people who are interested in new reactor designs, but the opportunities to actually work on them are few and far between. There are a few small companies that are doing a lot of work on new reactor designs, but they are not well-known outside of the industry.
  • #1
DR13
150
0
Where does a nuclear engineer work? At a nuclear plant? Out of an office? There have not been any new nuclear plants built in the US in many, many years. So is there any new designing/innovation going on or is it just maintaining day-to-day operations (checking dials, running diagnostics and whatnot)?

Thanks
DR13
 
Engineering news on Phys.org
  • #2
Most nuclear engineers at a utility would work in the engineering offices, which are not necessarily at the plant(s), although the engineering offices could be sited to allow NEs to visit the plants. That's a typically scenario for a utility that has multiple plants/units. If a utility has on plant, then more likely that most of the engineering staff is at the plant site.

Nuclear engineers at the vendors work in engineering offices, most of which are on site where fuel and components are manufactured.

Site preparation is going on at Vogtle for two new PWR units. There is work going on at South Texas project for two new ABWRs.

There is a lot of work on new plant designs and new reactor concepts.

http://www.nrc.gov/reactors/new-reactors.html
 
Last edited by a moderator:
  • #3
Astronuc said:
Most nuclear engineers at a utility would work in the engineering offices, which are not necessarily at the plant(s), although the engineering offices could be sited to allow NEs to visit the plants. That's a typically scenario for a utility that has multiple plants/units. If a utility has on plant, then more likely that most of the engineering staff is at the plant site.

Nuclear engineers at the vendors work in engineering offices, most of which are on site where fuel and components are manufactured.

Site preparation is going on at Vogtle for two new PWR units. There is work going on at South Texas project for two new ABWRs.

There is a lot of work on new plant designs and new reactor concepts.

http://www.nrc.gov/reactors/new-reactors.html

Ok. So there are new plants being made *now*. But what about over the course of a 40 yr career? There have been many times in US history when there were long times between construction of nuclear plants. Is it possible to have one's main work (over the course of a career) be based on designing new, more efficient plants even when there are no new plants being made? Or will there undoubtably be down times when all one does is basic day-to-day maintainence? Also, if specific companies have the rights to design the plants won't it be hard to get on design teams consistently?
 
Last edited by a moderator:
  • #4
DR13 said:
Ok. So there are new plants being made *now*. But what about over the course of a 40 yr career? There have been many times in US history when there were long times between construction of nuclear plants. Is it possible to have one's main work (over the course of a career) be based on designing new, more efficient plants even when there are no new plants being made? Or will there undoubtably be down times when all one does is basic day-to-day maintainence? Also, if specific companies have the rights to design the plants won't it be hard to get on design teams consistently?
Well, there has been only one period of time when there were no new plants being contructed in the US, and we're still in that period until someone starts pouring the basemat and foundation of a new unit. The core sizes of current plants are fixed, and many plants are as near as possible to equilibrium, which means there is a small variation in batch size (number of feed assemblies) and enrichment distribution. There is a handful of core designers at most utilities, and they usually do preliminary core designs on one or two units, and the vendor then does the final design. More of that work is performed off-shore, because foreign engineers are lower cost.

The new Gen 3/3+ plants have been in the design phase since the 1980's. Even though no new plants were under construction, new plants were being designed. Of course, there were a lot of plant modifications after TMI-2 failure and the Browns Ferry fire, but they were more to do with redundancy and retrofitting than improvements in plant efficiency.

Siemens introduced more efficient steam turbine technology in the 1990's, and that was retrofitted to a number of German plants. Mitsubishi has introduced a more efficient steam turbine system in the last decade.

In a large corporation, one's work can and will change according to the needs of the company and changes in the market. I've known quite a few people who have made careers at utilities and vendors, but they tend to be in the minority. Many people change change jobs (companies) or leave industry.

Getting a spot on a design team is very challenging. One has to be very good and have the right skill set.

The DOE is sponsoring more advanced Gen 4 plants.
 
  • #5
So I guess my main question is what is day-to-day life like for a nuclear engineer. Is it based on trying to make old reactors more efficient? Is it based on making new reactors? Or is it just running tests?
 
  • #6
Other than core design, nuclear engineers work on a variety of reactor or plant related issues. Day-to-day operation is handled by reactor operators and plant staff. Engineers get called in if there is a problem.

If one is working on a new plant, then one might do design work or testing. Then there is writing long reports.

For a new plant design, one has to comply with Federal Regulations.
http://www.nrc.gov/reading-rm/doc-collections/cfr/part052/full-text.html#part052-0041

Technical requirements
http://www.nrc.gov/reading-rm/doc-collections/cfr/part052/full-text.html#part052-0047

So there is a lot of work just understanding and making sure that one's design application complies with all the mandatory requirements.

And there's more - http://www.nrc.gov/reading-rm/doc-collections/cfr/part052/

and more generally http://www.nrc.gov/reading-rm/doc-collections/cfr/
 
Last edited by a moderator:
  • #7
Astronuc said:
In a large corporation, one's work can and will change according to the needs of the company and changes in the market.

That's right, but it is hard to really grasp this when you're studying in school. You could get your NE degree and start doing core design (working for one of the utilities, or one of the fuel vendors - Westinghouse or Areva or GE). You don't have to spend 40 years at it, though - most people move around. Maybe you get interested in the thermal hydraulics and move into fuel mechanical design, or LOCA safety analysis. Or maybe you have a more philosophical bent, and move into Licensing. Or maybe you like the operational aspects and get into procedures. Or non-LOCA safety analysis... Or maybe you do ALL those things over your 40 years. The degree is just the entry ticket, you don't have to do the same work for 40 years. Tho there are guys like that around, who get to know more & more & more about a specific aspect of the design or analysis. You can do that if you want to, but nobody has to if they don't want to.
 
  • #8
lets see... come in, sit at my desk and drink a cup of coffee, work on calculations related to room heat up, head loss through pipes, tank level set points, etc. Browse PH on lunch break, continue calcs, go home, repeat ;P.

Usually the offices that engineers work at at nuclear plants are connected to the plant (you can walk out of the office door onto the turbine deck). There are different engineering departments at a plant. Some engineers do analysis calculations, some deal with regulatory issues, some do design type stuff for implementation of new equipment. Some engineers are assigned specific systems and equipment to become experts in and are usually the first point of contact if something starts to go wrong with it. They will also perform inspections/tests on the system/equipment.

Keep in mind that engineers do not manipulate plant equipment, it is almost entirely a "pencil pusher" job as they say.
 
  • #9
I thought that not a single new nuclear power plant has been built in the United States since the Three Mile Island incident.
 
  • #10
The_Absolute said:
I thought that not a single new nuclear power plant has been built in the United States since the Three Mile Island incident.
One plant started construction in 1983 (Skagit, near Richland Washington), but it had been ordered in 1973. The last one was ordered in 1978, a year before TMI. Only 10 units were ordered from 1975 on. Bascially the costs of nuclear power were increasing with inflation in the mid 1970's and the economy was slowing down.

The last unit finished was Vogtle 2 (1 Q89), but it had been ordered in 1974. Most operating plants were ordered before 1975.
 
  • #11
The_Absolute said:
I thought that not a single new nuclear power plant has been built in the United States since the Three Mile Island incident.

As astronuc elucidates above this is incorrect. Further, note that the plants in the US were typically licensed to operate for 40 years (so even taking 1979 as the license date, the plant will operate until 1979+40 = 2019). Many have been relicensed for a 60 year life (1979+60 = 2039). I got my masters in nuclear engineering in 1980. I've been busy ever since (never out of work) and I expect to keep busy as long as I choose to.

More importantly, these units are durable, long-lived, substantial facilities. A point often neglected when the 'price tag' of new construction is discussed.
 
  • #12
It is true that new plants haven't been built, but most existing plants have been upgraded. In addition to plant life extension (by an extra 20 years), most units have also been uprated, and many have been uprated 20%!

New Gen 3 plants are being designed for at least 60-year lifespans, with the potential for 80 years.
 
  • #13
There are many things that nuclear engineers do, ranging from medicine to oil exploration, but nuclear power is their primary job function. Nuclear engineers can do almost any job at a nuclear power plant from reactor operator, to senior reactor operator, to system engineer. However, the 3 most typical jobs are reactor engineer, core design engineer, and licensing engineer.

The reactor engineer is the system engineer for the nuclear core. If you consider the reactor operator and senior reactor operator as the copilot and pilot, the reactor engineer is the navigator. Reactor engineers provide guidance to operators on how to maneuver and operator the core.

Core design engineers design fuel bundles and cores to meet plant cycle energy needs. Someone said in an earlier post that plants basically operate on an equilibrium cycle now. This is not true, at least not for BWRs. New more efficient and more complex fuel bundles are being designed all the time. We are now operating 'plants much longer and at higher power on less fuel than we did 20 years ago.

Licensing engineers are experts on the laws and regulations governing operation of reactors.

Mark Laris
Chief Nuclear Engineer
 
  • #14
mjlaris said:
There are many things that nuclear engineers do, ranging from medicine to oil exploration, but nuclear power is their primary job function. Nuclear engineers can do almost any job at a nuclear power plant from reactor operator, to senior reactor operator, to system engineer. However, the 3 most typical jobs are reactor engineer, core design engineer, and licensing engineer.

The reactor engineer is the system engineer for the nuclear core. If you consider the reactor operator and senior reactor operator as the copilot and pilot, the reactor engineer is the navigator. Reactor engineers provide guidance to operators on how to maneuver and operator the core.

Core design engineers design fuel bundles and cores to meet plant cycle energy needs. Someone said in an earlier post that plants basically operate on an equilibrium cycle now. This is not true, at least not for BWRs. New more efficient and more complex fuel bundles are being designed all the time. We are now operating 'plants much longer and at higher power on less fuel than we did 20 years ago.

Licensing engineers are experts on the laws and regulations governing operation of reactors.

Mark Laris
Chief Nuclear Engineer

Equilibrium cycle my butt! I'm a core designer for a PWR and every cycle is significantly different from the previous. We design to meet specific energy targets and have other considerations to deal with to get the most for our (customer's) money.
 
  • #15
QuantumPion said:
Equilibrium cycle my butt! I'm a core designer for a PWR and every cycle is significantly different from the previous. We design to meet specific energy targets and have other considerations to deal with to get the most for our (customer's) money.
:smile: I think it's easier to approach equilibrium in a BWR than a PWR, at least that's my experience. Having smaller (and more) bundles is a benefit.

Of course, no unit gets to equilibrium, but some are closer than others, at least in terms of batch size and EFPH.

Unplanned outages and/or derates are a complication.

And cycle extension and uprates change the equation.

Twenty years ago, the industry was transitioning from annual cycles to 18-mo cycles, and some started looking at 24-mo cycles. Moderately rated PWRs (14x, 15x, 16x) can do 24-month cycles relatively easy, but high duty (heat flux / boiling limited) 17x plants really can't do 24-month cycles. An interesting cycle management approach for 17x17 plants is the one used by Diablo Canyon with cycles of 19-20-21 months repeated. So an assembly can go through discharge in 5 years and three cycles. That's probably unique to their market though. Their neighbor to the south, SONGS, uses 24-mo cycles.

Interestingly, the new plants, particular EPR and US-APWR (both 17x17 cores, but 13.8 feet (4.2 m) core height) are looking at 24-month cycles. They have moderate core average LHGRs though.
 

Related to Are Nuclear Engineers Still Innovating Despite Few New Plants Being Built?

What is the role of a nuclear engineer?

A nuclear engineer is responsible for designing and developing nuclear power systems, as well as maintaining and improving existing nuclear facilities. They also play a vital role in ensuring the safe and efficient operation of nuclear power plants.

What education and training is required to become a nuclear engineer?

To become a nuclear engineer, one typically needs a bachelor's degree in engineering, physics, or a related field. Many nuclear engineers also pursue a master's or doctoral degree in nuclear engineering. Additionally, most countries require nuclear engineers to be licensed through specialized training and exams.

What are the potential risks of working as a nuclear engineer?

Like any job in the field of science and technology, there are potential risks associated with being a nuclear engineer. These can include exposure to radiation, high-pressure and high-temperature environments, and the risk of accidents. However, with proper training and safety protocols, these risks can be minimized.

What skills are important for a successful career as a nuclear engineer?

Strong analytical and problem-solving skills, attention to detail, and a strong understanding of mathematics and physics are all important for a career as a nuclear engineer. Good communication and teamwork skills are also essential, as nuclear engineers often work in teams on complex projects.

What current advancements are being made in the field of nuclear engineering?

Some current advancements in nuclear engineering include the development of advanced nuclear reactors that are safer and more efficient, as well as research into alternative uses for nuclear technology, such as in medicine and space exploration. Additionally, efforts are being made to improve the sustainability of nuclear power by developing more efficient fuel cycles and reducing waste.

Similar threads

  • STEM Career Guidance
Replies
5
Views
1K
  • Nuclear Engineering
Replies
5
Views
5K
Replies
12
Views
4K
Replies
6
Views
3K
  • Nuclear Engineering
Replies
27
Views
7K
  • STEM Academic Advising
Replies
2
Views
1K
Replies
2
Views
87
Replies
14
Views
8K
  • STEM Academic Advising
Replies
5
Views
1K
  • General Engineering
2
Replies
67
Views
4K
Back
Top